Guideline-Based Equipment Cost Estimate
The Guideline-Based Group 2 Equipment Cost Estimate form (JCAF 33) uses cost allowances per ASF from the Instructions for Preparing 1995-96 Capital Outlay Budget Change Proposals, September 1993 to estimate equipment costs for Group 2 – Movable Equipment only. Group I - Fixed Equipment costs are estimated based upon designed needs described in the working drawings and specifications for the project. The cost of Group I Fixed Equipment is included in the construction component of the FPP.
|